Mulch: how many cubic yards?
One cubic yard is 27 cubic feet. Spread 3 inches deep (a quarter of a foot), it covers 27 ÷ 0.25 = 108 square feet. At 2 inches it covers 162 sq ft. So a 600 sq ft bed at 3 inches needs about 600 ÷ 108 = 5.6, call it 6 cubic yards.
| Depth | Area covered by 1 cubic yard |
|---|---|
| 2 in | 162 sq ft |
| 3 in | 108 sq ft |
| 4 in | 81 sq ft |
Units that keep the estimate clear
- Clean-ups and one-off work as a fixed job price.
- Mulch, soil and stone per cubic yard, installed.
- Sod and seeding per square foot, including soil prep if you do it.
- Edging and borders per linear foot.
- Plants per plant, by container size.
- Maintenance per visit, with the number of visits in the season.
Accepted? Switch the document to an invoice when the work is done, or send a receipt when a customer pays in cash.
Frequently asked questions
Should I quote maintenance per visit or per month?
Both work. Per visit is clearest when the number of visits changes with the weather. A flat monthly price is easier for the customer to budget; then state how many visits it includes.
Can I download it as Word or Excel?
Yes. Every document downloads as PDF, Word (.docx) and Excel (.xlsx). The Excel file keeps working formulas for line totals, tax and the grand total, so you can keep editing it offline.
Is it really free?
Yes. Creating and downloading documents is free and needs no account. Free documents carry a small "Created with PlanPrint" line at the bottom. Documents Pro removes it and adds a saved client and item library.
Guides
- Estimate vs quote vs bid vs proposal
What separates an estimate, a quote, a bid and a proposal, when to send which, and what each document should contain. With a side-by-side comparison table.
- How to write an estimate customers say yes to
How to write a job estimate step by step: scope, line items, materials and labor, exclusions, validity date and payment terms, with a worked example.
- Net 30 and 2/10 net 30 payment terms, explained
What net 30, net 15 and 2/10 net 30 mean, how to calculate the due date and the early-payment discount, and why skipping a 2% discount costs about 37% a year.